Every building will have the slab or floor without the slab or floor the building is incomplete. The slab design has two types of reinforcement schedule they are
* One way slab
* Two way slab
This type of slab can be checked on slab design. If the supervisor or Engineer in the construction site need to check the slab design to found out is it corrected or not the following method is used
The slab dimensions are measured the larger length is taken as x and smaller distance is measures as y.
Now the x length is divided by y length. The result obtained is less than 2 then it is two way slab.
If it is greater than 2 then the slab is one way slab.